Agenda Item
Meeting Date:
10/24/2024 - 6:00 PM  
Category:
Construction  
Type:
Action  
Subject:
Indoor / Outdoor Track Early Release Package for Pre-engineered Metal Building  
District Goals:
Goal 1
Thriving Students
Goal 2
Engaged Community
Goal 3
Empowered Staff
 
Enclosure:
 
File Attachment:
 
Summary:
This early release package is for the Pre-Engineered Metal Building that will house the indoor track. Releasing the package early helps with long lead times on materials.  
Budgetary Impact:
This project will be funded with the voter approved 2023 Bond dollars.  
Recommendation
Recommend approval of the Guaranteed Maximum Price of $15,626,755 for Indoor/Outdoor Track Early Release Package of the Pre-Engineered Metal building.  
Approvals:
Recommended By:
Signed By:
Randy Reaves - Executive Director of Operations
Signed By:  
Michael McFarland - Superintendent
 
Vote Results:

Original Motion
Member June Davis Moved, Member LaTonya Mayfield seconded to approve the Original motion 'Recommend approval of the Guaranteed Maximum Price of $15,626,755 for Indoor/Outdoor Track Early Release Package of the Pre-Engineered Metal building.'. Upon a Roll-Call Vote being taken, the vote was: Aye: 7 Nay: 0.
The motion Carried 7 - 0
   
June Davis     Yes
Mia Hall     Yes
Gary Grassia     Yes
LaTonya Mayfield     Yes
Nedra Robinson     Yes
Kelicia Stevenson     Yes
Daryl Davis     Yes